Showing posts with label house. Show all posts
Showing posts with label house. Show all posts

Monday, July 28, 2008

It's like peeing in a field!

This weekend was the weekend of demolition! Matt and my father built the floor that is going to extend into our hallway/staircase on Saturday. Then, Matt and I ripped out the bathroom and the wall between the bathroom and the old master bedroom.
The hole to the right was once a built in bookshelf/towel holder and the wall you see to the left is the one to the master bedroom.This is what our bathroom looks like now...minus the 2x4 in the middle...that is now gone! There is still more work to be done. The ceiling isn't completely out yet, Matt will be working on that tonight. Plus, the floors have to come out before the plumber gets here as well...and the new wall between the bedroom and the bathroom has to be built. The plumber will be here a week from tomorrow to get it all done. So, until then...or actually, until a couple of days after that...we'll have limited privacy in the bathroom!!

It's a MESSY job...but will be well worth it in the end!

Tuesday, July 22, 2008

Swift Progress!

More progress on the home front...We are now minus one ceiling in our hallway. This is in preparation for the framing that is going to happen this weekend. Still more work to be done, the floors will be coming out this week as well, but things are going quickly...which is very good news to me.

On another front...Matt signed up for two new media classes today. Very excited about that. He is now on his way to a BA in new media. SWEET!! I found out the books that I need to buy today as well and learned, which I already kinda knew before, that the University likes to gouge its students with book prices. I can buy my books on amazon for like $50 bucks or something like that. Guess we know where I'll be buying our books!!

Saturday, July 19, 2008

The Fun Part of Renovation!

Yesterday was the day!!

We went out after work and pick out the tiles to match our vanity and countertop. We had picked out the vanity last weekend but needed to talk to the plumber to make sure that it was going to fit and everything. So, with the approval of the plumber, Matt went and ordered it yesterday. It is still small, but I think that it will give us some extra storage since we are going to be loosing our linen shelves when we make the bathroom larger. I'm still not sure where everything is going to go (all of our bathroom stuff), we may have to do some weeding out of the junk (which would actually be a good thing)!

We bought the countertop at Hammond Lumber as well. I think that it is going to look really nice on the dark vanity. I absolutely love the color and I knew that I wanted that granite when I saw it! We also bought a faucet very similar to that except it is in brushed nickel. I think its going to look REALLY nice! I'm very excited. My only concern is that the vanity being dark, will be the ony dark piece in the bathroom and may look out of place. Granted, we will have a dark brown/black mirror/medicine cabinet but that will be right over the vanity so I'm not sure it will balance it out. We are going to do another built in bookcase door going up to the attic so we may paint the inside of it black instead of the while like the mouldings, but I'm not sure that would look right either. There may be an opportunity to have some dark shelves over the toilet or something like that as well. We'll see.

We went and looked at a bunch of tiles yesterday and although I really wanted marble on the floors, I'm no longer sure it is practical. My parents have marble in their bathroom, but I guess it scratches and I certainly don't want that. Plus given the fact that we have animals, it is pretty likely that may happen. Plus, when we went to the store, I couldn't find any marble I liked anyway. BUT, I did find some regular tiles that I really liked. So, I think that we've got the floor and shower surround tiles picked out.

The tiles in the back are going to be in the shower and the ones at the top are going to be an accent row in the shower. The middle one is the vanity top. The picture makes the shower tiles look a little bit washed out. They are actually a little bit darker than they look. I think that it will look nice all togather. I wanted something that would be neutral and in 5 to 10 years won't need to be redone because it looks dated. I don't want to have to do this again anytime soon!! I'm very, VERY excited to get this all in and done. We are hoping to have it all finished and usable by September 1. Cross your fingers...it's going to be a lot of work!! Today begins the actual distruction of the floors in the hallway downstairs to add in some posts to hold the tub up. Pictures to come....

Wednesday, July 16, 2008

Happy Days Are Here Again!!

Matt has talked with his advisor at the University and it looks like it will still take him 4 years, however, he will be able to take some classes at UMaine Augusta or Eastern Maine Community College. It looks like he's going to take a majority of his gen ed classes at one of those two places and they will transfer over. So, it looks like we could potentially save a good chunk of money by doing that, which makes me much more comfortable than spending all that money at UMaine, especially for the same class. Things are looking up at the Green-Hamann's, that's for sure!! Hip Hip...Hip Hip!!

Plus, we are only around 3 weeks away from going down to Massachusetts to see my aunt who is coming up from Florida. I haven't seen her since my wedding last October, and I haven't seen Mickey since I don't know, maybe since my grandfather died and that was maybe 7 years ago. So, it is going to be so great to see him again, especially since he's had a rough time of it with the cancer (hense the reason he wasn't at our wedding).

Additionally, we had another plumbing guy come over today and he gave us a quote of $1,000 to do the plumbing in the bathroom!!! This is fabulous news, considering the other guy wanted to charge us $4,500. Granted this new guy isn't going to take out the cast iron pipe (unless needed). Plus he also said that he only needs like a week's notice and he'd be able to come in and do the plumbing, which means that it is very possible that we might have the bathroom complete before we start school back up, which would take a load off of both of our shoulders! He also did some heating work at my parents house so he is a known quantity. Very, VERY exciting!!